22-01 Townhouse Villages at Eagle Lake

Project updates

Updates are posted on this page. Sign up to receive email notifications. Emails are for information only; do not reply to them.

Email the project coordinator with your address if you have:

  • Irrigation lines
  • Invisible pet fence
  • Plans to widen the driveway

Schedule

The open soil was sprayed with hydromulch (no seed included) in areas where sod is planned. This is for erosion control and is not a permanent solution. Landscaping still needing work is planned for the week of July 24. Other outstanding items are continuing. Expected start for sod replacement is the end of August or early September. This timeframe gives sod the best chance for survival and long-term growth.

Maps

22-01 Phasing map (PDF)
22-01 Location map (PDF)

Letters to residents

2-4-22 Public hearing notice (PDF) single-family homes
Correction: Public hearing date is March 21, 2022.

2-4-22 Public hearing notice (PDF) high-density homes
Correction: Public hearing date is March 21, 2022.

3-22-22 Special assessment letter (PDF) single-family homes
3-22-22 Special assessment letter (PDF) high-density homes
5-3-22 Notice of construction (PDF)
5-18-22 Phase 1 construction notice (PDF)
7-1-22 Phase 3 irrigation, pet fence, and final phase repairs (PDF)
7-25-22 Phase 1,2 & 5 irrigation, pet fence, and final phase repairs (PDF)
7-25-22 Phase 5 construction notice (PDF)
11-30-22 Temporary winter stabilization (PDF)
5-22-23 Completion of project (PDF)
06-22-23 Warranty letter (PDF) Correction: To contact the city, email streetrehab@maplegrovemn.gov